四六级

2018上半年英语六级阅读模拟练习题(52)

时间:2018-02-01 来源:文都网校 浏览: 分享:

      距离2018年6月的考试还有半年,想要轻轻松松地赢得考试,不如从现在开始和小编一起看看一下这些英语六级阅读练习题吧,希望对广大同学有帮助!

      In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

      There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

      After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

      After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

      In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

      1. The main difference between panel method and the method discussed in the last paragraph is_______.

      A. the latter uses ready-made internal features

      B. panels are cast in a level position

      C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

      D. the former is more expensive than the latter

      2. Which of these statements is TRUE of system building?

      A. It employs more men. B. It is difficult and dangerous.

      C. It can save both time and money. D. It means less mechanization.

      3. According to the passage, the principle of system building is that_______.

      A. construction methods are safer

      B. buildings are made from a set of standardized units

      C. similar buildings can be produced

      D. all units are produced on the site

      4. The usual fixed length in the modular system is_______.

      A. twenty centimeters B. ten millimeters

      C. fifty centimeters D. ten centimeters

      5. What lifts the concrete panels onto the building?

      A. Cranes. B. Man-power.

      C. Pulleys. D. Hydraulic jacks.

      参考答案:

      1. A 2. C 3. B 4. D 5. A

      以上就是小编为大家介绍的相关信息,希望对大家有帮助。想了解更多四六级备考课程备考资讯,请点击文都网校四六级资讯站查询!有问题找文都☞☞☞详情咨询入口>>>

    文都名师助力通关2018年6月四六级考试
    2018年6月大学英语四级协议班 2018年6月大学英语六级协议班

         编辑推荐

    热点聚焦 备考交流

    2018年6月英语四级基础备考指导

    2017年12月四六级考试成绩核查办法

    2018英语四六级考试综合辅导

    2017年12月英语四六级考试成绩查询时间

    2018年6月英语四六级记单词小技巧

    2017年12月英语四六级成绩单查询真伪

    英语六级考试是什么水平?

    英语四六级阅读解题步骤

     

    文都网校四六级学习群1:1139836391【加群

    文都网校四六级学习群2:1053314777【加群

    文都网校四六级学习群3:821773913【加群

    文都网校四六级学习群4:887259542【加群

    热门课程
    热文排行