2017年12月英语六级阅读练习及答案(2)
时间:2017-07-26 来源:文都网校 浏览:暑假已经来了,大家的英语六级复习的怎么样了呢?文都小编要和大家一起准备英语六级考试哦!大家复习做多的就是阅读题吧?小编要和大家一起做阅读啦,以下是小编为大家收集的一篇英语六级阅读,考生可以用来练手哦!
In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
参考答案: 1. A 2. C 3. B 4. D 5. A
以上是小编为大家提供的一篇阅读,需要了解更多考研资讯的考生可以点击文都网校四六级资讯站!
文都版2017年6月英语六级考试真题及答案解析已经在考后公布,各位参加考试的同学们!一起点击下面图片进入2017年英语四六级真题及答案解析专题,了解自己的答题情况吧!
文都名师助力通关2017年12月四六级考试 | |
2017年12月大学英语四级畅学通关班 | 2017年12月大学英语六级畅学通关班 |
编辑推荐
热点聚焦 | 备考交流 |
2017年6月英语四级真题汇总 | 2017年6月英语六级真题汇总 |
2017年6月英语四级真题答案汇总 | 2017年6月英语六级真题答案汇总 |
2017年6月英语四六级成绩查询时间 | 英语六级大纲词汇(音标版) |
2017年6月英语四六级成绩查询常见问题 | 2017年6月英语四六级真题解析专题 |