2017上半年英语六级阅读训练50
时间:2017-05-22 来源:文都网校 浏览:阅读是六级考生最有希望拿到高分的一个项目,在阅读考试中有几类常见题型,考生若想取得好成绩,就一定要熟悉各大题型的做题思路,并把学到的英语六级阅读技巧应用到解题当中,下面是小编为大家提供的一些阅读习题,希望对大家勤动笔,多练习。
In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. Which of these statements is TRUE of system building?
A. It employs more men.
B. It is difficult and dangerous.
C. It can save both time and money.
D. It means less mechanization.
2. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. What lifts the concrete panels onto the building?
A. Cranes.
B. Man-power.
C. Pulleys.
D. Hydraulic jacks.
5. The usual fixed length in the modular system is_______.
A. twenty centimeters
B. ten millimeters
C. fifty centimeters
D. ten centimeters
【参考答案】
1. C 2.A 3. B 4. A 5. D
希望大家多练习、多总结,争取在6月份取得满意的考试成绩!想了解更多冲刺备考经验,请关注四六级冲刺备考专题!
文都名师助力2017年6月英语四六级考试通关课程 | |
2017年6月大学英语四级VIP定制班 | 2017年6月大学英语六级VIP定制班 |
编辑推荐
热点聚焦 | 备考交流 |
文都网校5月四六级课程优惠活动 | 2017年6月四级听力新题型备考攻略 |
2017年上半年英语四级口语考试题型构成 | 2017上半年英语四级5月备考方案 |
2017年上半年英语六级口语考试评分标准及考试形式 | 2017攻克大学英语六级仔细阅读的实用策略 |
2017四六级口语准考证打印时间 | 2017上半年四级备考:3步轻松搞定漫画作文 |
- 英语六级
- 2017英语六级阅读
- 2017英语六级阅读
- 责任编辑:lzx